强烈抗议SHERKY在瞎折腾CO,你说这本是PP的事情,你弄来干做啥?这不是严重扰乱社会主义ERP精神文明的不职业道德问题吗? 兄弟,做SAP没学会屠宰术,没关系,但是起码连推拿术要学会呀, ,告诉你一个秘诀,搞不定的事情责任往其它模块推,FICO嘛,你想往那推都行,象这问题就推给PP,SD去弄,你只要翘起二郎腿等结果就可.配置的MTO,为何在工单完工入库后不产生会计凭证?答:本来是不想回答的,怕你小子又顶呀顶的,很烦, 你这make-to order搞成了non-valuated的,然后看看req. class我这是45,你用40 , 看看req class 040(SAP default ) Results Analysis Key你使用的000004(WIP calculate for sales order)? If you use nonvaluated sales order stock or nonvaluated project stock , you must carry out a results analysis in the course of period closing if you want to determine the stock values of finished and unfinished products.SAP help: You use results analysis in conjunction with a nonvaluated sales order stock (An inventory for processing a sales order.The value of this inventory is determined by results analysis at the end of the period.) to determine the value of the inventories of unfinished and finished products at the end of the period. If you are using a nonvaluated sales order inventory and calculate the work in process on the basis of the orders assigned to the sales order item (normally the production order) for individual requirements materials, you will not receive complete costs and will therefore have no complete basis for valuation with multilevel BOMs.你好,看来先前的问题没有解决。
1.我之前的回答,不太真确,更正一下。SAP里面这几个scrap都是影响 BOM展开和净需求计算,物料时assembly层的scrap还是component层的scrap,都是同时影响MRP和production order。Net scrap ID只会用来deactivate assembly scrap,影响同时作用于MRP计算和production order的reservation生成。另外,你这里说的MRP4里面的原料废品率(component scrap)实际上是和BOM item里面的component scrap是一个东西,如果BOM item里维护有value,那么material master里面的value就无效了。
2.这样看来,SAP提供的几种不同的scrap是无法把dependent requirement的计算和reservation的计算区分开,那么我们应该从源头考虑,即增加需求。
原本component scrap也是一种增加需求的方式,但在目前看行不通。从你的描述来看,你的生产应该是MTS(make to stock)的生产模式。我的建议是通过原料的safety stock安全库存来控制,保证尽管用于满足订单和预测的原料采购是按照理论标准值,但是还有充足的安全库存,以确保实际生产时有足够的原料弥补报废。安全库存的计算可以根据一段时期的实际生产情况给出一个合理的数值。不同原料的安全库存是不一样的,这样也可以保证资金占用和仓库空间占用的合理性。
还有问题,可以给我发信息。
评论列表(0条)